scaffold tower
Construction Consultant

How to Erect a Aluminum Scaffolding Tower

A Scaffold tower is recognized as the most suitable application of scaffold when working at a certain height. To erect scaffolding tower, the advance guardrail system and Through-The-Trap (3T) should be considered as a safe method of work. To erect the scaffold tower, it can be done by fitting base frames & horizontal braces, with the support of steel tube into the vertical upright and double couplers on towers above 4m. So that the erect scaffolding tower can build by continuous diagonal braces.

How to erect a mobile scaffold tower
There are various steps involved to erect the scaffolding mobile tower

Following are the key steps involved to erect a mobile scaffold tower.

  • Fix castors into a base frame and locked castors by attaching the brace to the vertical tube
  • Secondly, attach the end of the braces to the horizontal brace
  • Adjust four diagonal braces and make the sure that level of legs should be placed equally
  • Insert riser frames into the taps of base frames
  • Attach guardrail frame to erect scaffolding
  • After that, attach one to one diagonal brace from top of guardrail down
  • Attach the ladder to scaffold
  • Place the toe boards on the ground so that the scaffold has a basis
  • At this stage, single width scaffold fitted with external and outrigger ties
  • At last, erect mobile scaffold tower with all four wheels locked

The great news is that a scaffold tower provides access to places that ladders can’t really go! The working decks allow for trades to complete their set-out work in no time! If you think about it, even if you’re trying to paint your eves on your home, let’s say they are 5 meters in the air! By the time you set up a ladder, climb up and down over and over again and place it in different positions, this will take 3 times the effort and energy! Think about what else can be done in that time spent! Both on a DYI level it saves money, on a business level its a sure fire win!

Mobile Scaffolding Tower
Construction Consultant

Who Can Erect Mobile Scaffolds That Are Hired?

Mobile scaffolding is a temporary structure used for construction purposes. It facilitates or support work crew during the development of various types of house maintenance and remedial works carried out on the property whether it is residential or commercial. Mobile scaffolding is the best alternative to a ladder that can be used by trades or home DIY getting their hands dirty! Used in major construction projects for the safety and protection of the work environment. The mobile scaffold is erected according to the Australian manufacturer’s instructions. Transom scaffolding is the Australian company that provides instructions & direction for the safe erection of mobile scaffolding:

  1. First, fit castors in a base-frames
  2. Secondly, a horizontal brace is attached to a vertical tube of the base frame
  3. Thirdly, the spare end of brace attaches with another base frame. But just remember the second step horizontal brace will have a similar position on the base frame.
  4. Next, the plan brace attaches diagonally into a direction of the horizontal place supported to the base frames
  5. After that, attach diagonal braces to the base unit
  6. At step six, insert riser frames of the base frame
  7. In the seventh step, insert working platforms
  8. After that, the two horizontals must be clipped with a required platform level
  9. Next, repeat step six and eight unless the work crew reaches the top of the working platform
  10. Two diagonals fit at the top platform level
  11. Fit toe boards and ladders accordingly at each level
  12. Examine properly or make sure that all wheels must be locked
  13. Before using any tower, it must ensure that scaffold built correctly
  14. Finally, assure the safety compliance sticker for a safe working environment

All such steps are required to erect scaffold safely and execute work at any site properly. However, unsafe scaffolding may result in serious injury or death. The main purpose of mobile scaffolding is to get access/viewing towers, ski ramps, grandstand seating, concert stages, forms of shoring, and art projects. Erect scaffolding is a dangerous work by nature. Therefore, only licensed or qualified professional dismantles and erect scaffolding. An Australian Standard AS/NZS 4576 governed towards advanced certificates of dismantling and erect scaffolding. The only exception is if the mobile tower does not exceed 4 meters in height and 1 standard 1.8 or 2.4 bay in width then it can be assembled via the hirer directly.

THINGS TO CONSIDER WHILE HIRING SCAFFOLD
Uncategorized

Things to Consider While Hiring Scaffold

If you’ve been on the internet searching for the phrase hire of scaffolding, then the good news is you’ve landed on the correct page to give you the information that you require. The term hire of scaffolding refers to a pretty large area and category when talking about the scaffolding industry, whether you’re searching for:

  • Residential Scaffold
  • Commercial scaffold
  • Industrial scaffold
  • Special projects scaffold
  • Underwater submergible scaffold

Most of the time people that are searching this search term they are looking to hire scaffold for a project whether it be an owner builder residential double story home, to a junior estimator in a large building firm looking to scaffold a major commercial project. The good news is that the page you have landed on we are going to give you the necessary information regarding the questions you’re asking if you’re after a quote for your project we require the following things to streamline the process:

  • Any architectural plans of the property
  • Any photos of the area that you wish to place the scaffold
  • Any contact details of site personnel that we need to contact to ask for further information

When looking at these three points above their very important when it comes to scoping and pricing scaffold for your project. The term hire of scaffolding as again is a very broad phrase to type into the search engine and sort of get a response that you’re looking for at whatever time of the day that you are searching. The great news is that Transom Scaffolding is a complete scaffolding solution to any size project operating in Sydney, New South Wales, Australia.

We have the dedicated resources in place to answer any questions regarding how much it cost to set up erect and dismantle the scaffold once the project is completed. Initially, a lot of people ask when they type in hire of scaffolding phrase another phrase “hire period” comes into question! The hire period of the scaffold is basically the time that we set up to the time that we remove the scaffold, and any additional time that’s required that’s outside of the original quotation.

So, in summary, if you have typed in hire of scaffolding or hire of the scaffold and you require a quote for your project of any size and any place within Sydney then don’t hesitate to contact transom scaffolding to provide you a competitive and professional quotation with the professionalism to back it.

SEEKING SCAFFOLD SOLUTIONS FOR A DOUBLE STORY HOME IN SYDNEY?
Architecture & Building, Construction Consultant

Seeking Scaffold Solutions for a Double Story Home in Sydney?

Are you on the internet searching for scaffolding for a double story home? The answer is you’ve landed on the correct page, we here at Transom Scaffolding provide scaffolding solutions for any size double story home either if it’s a 15-meter frontage to a 45m frontage? We can accommodate this no problem at all! With our in-house design team using the latest scaffolding design software our engineers use to scope and design the scaffold to suit your construction requirements to the point where there is no issues or delays during the erection of the scaffold and most important during the construction of your project.

Double story scaffolding Sydney is a keyword that is searched quite often as there are many two-story homes being built in basically every suburb and every pocket of Sydney. The reason double story homes are so popular is that they provide a larger floor space ratio then your single-story dwelling which in turn the bigger the family the bigger requirements of space and so forth.

Transom scaffolding has the capacity for scope design and erects your scaffolding requirements for your double story home, we follow the strictest safety protocols and we abide by the New South Wales safety regulations for the scaffolding industry. We are licensed, ticketed and fully insured to operate the assembly of the scaffold in any construction environment.

One of the other questions that are generally asked is how long it would take to set up the scaffold, generally, if the plans are sent to our design team this minimizes the duration of the quote being sent out to you. If a site visit is required, our project estimators will be in touch to arrange an on-site visit at your project site, they will gather all the information take necessary photos, measurements to assist in the scope and then come back to you and provide you with a price for erecting the scaffold for the hire period.

A few points to remember when seeking a quote for scaffold for a double story home in Sydney:

  • View key points to remember when seeking a scaffolding quote for a double story build in Sydney
  • Have all the necessary architectural plans at hand
  • Have all the photos and measurements at hand
  • Have all the necessary contact details for site Personnel for our project estimators to contact if a non-so visit is being conducted
  • Have all the address details at hand
  • If all these requirements are readily available this will assist and speed up the quotation process

How to Erect Scaffolding Safely?

Scaffolding is an essential part of building homes and for maintenance work. Scaffolding is widely preferred over the benefits it offers and largely depends upon factors of trust and reliable towards the worker.

Any sort of oversight while erecting a scaffolding could lead up to danger and cause serious accidents and cause mishaps.

Scaffolding helps the worker to reach points where his arm isn’t reaching. Scaffolding offers him a simple guide of height to such points without any awkward angle in between.

Scaffolding is built over a mud sills base plate to attach it to make footing more hard and unmovable. You need to lay stress upon scaffolding level and on secure ground. If you are at unlevel ground or place that’s not appropriate, you might need to make dirt level at the high ground or if the surface is at drastic slope try using the leg extensions available.

  • If your work requires you to move the scaffolding to various places, make use of the casters. It will help you to move the scaffolding freely.
  • Assemble the end of the scaffolding frame in a way to make it suitable to work over.
  • Make sure that the ends of the scaffolding work properly. Scaffolding isn’t moveable and rigid towards the place.
  • Lift the planks through the scaffolding bars and reassemble it according to your convenience and voyage with respect to height, planks should be placed over scaffolding.
  • Secure scaffolding edges should be reused while the preparation of scaffolding. Use ladders for reaching to a certain height in a scaffolding.
  • Guardrails are an essential part of a scaffolding to assemble it properly and efficiently
  • Consider using a tie offs and other fall protection.

The Scaffolding should be inspected carefully while setting up all pieces and to make sure all pieces are secure. Reinspect the scaffolding setup details every time you leave the site to return over and make sure it’s still safe.

 Hire Scaffolding

Scaffolding is essential for the construction purposes which are being used for constructing a building.

Using scaffolding not only enhances the work efficiency of the workers but also reduces time over which the task is required to be completed.

Safety Measures

While using a scaffolding there are a lot of safety measures that are to be taken care of. The quality of the material which is to use while building a scaffolding should be the best. The low-quality material could result in scaffolding erection.